Other Manufacturers · 5 stages in 3D

Different products. The same factory problems. The same fixes.

Whether you make parts, plastics, food or chemicals, the flow is similar: material in, value added, quality checked, goods out. Here is where zappy.day helps at each step.

Scroll to walk the factory floor
01 / 05

Raw material

Material is received, inspected, stored by location and issued to production against work orders.

Who's involved: Store keeper, purchase
Where money leaks

Stock mismatch, over-buying and stock-outs that stop production.

With zappy.day

Location-wise stock, issues against each work order, and reorder alerts.

Stock that matches
02 / 05

Machining & processing

Machines convert material into parts. Each machine has a plan, an operator and a setup.

Who's involved: Operators, shift supervisor
Where money leaks

Idle machines, unplanned breakdowns and scrap that is never measured.

With zappy.day

Machine-wise plans, downtime reasons and scrap captured on mobile, with utilisation shown daily.

More output, same machines
03 / 05

Assembly

Parts and sub-assemblies come together into the finished product on a line or at stations.

Who's involved: Assembly workers, line supervisor
Where money leaks

Missing parts stop the line, and work-in-progress is invisible.

With zappy.day

Work orders with part availability checked in advance and WIP visible by stage.

Smooth flow
04 / 05

Quality check

Products are inspected against specifications before packing.

Who's involved: QC inspector
Where money leaks

Rejections are found by the customer, and there are no records to find the cause.

With zappy.day

Inspection results per batch, with rejection reasons and trends.

Fewer rejections
05 / 05

Packing & dispatch

Goods are packed, loaded and sent with documents. Then accounts follow up payment.

Who's involved: Dispatch, driver, accounts
Where money leaks

Late dispatch, missing documents and slow collections.

With zappy.day

Dispatch planning, same-day invoices and automatic payment reminders.

On time, paid on time
The whole process at a glance

Manufacturing plant: stage by stage.

StageWhere money leaksWhat zappy.day does
1. Raw materialStock mismatch, over-buying and stock-outs that stop production.Location-wise stock, issues against each work order, and reorder alerts.
2. Machining & processingIdle machines, unplanned breakdowns and scrap that is never measured.Machine-wise plans, downtime reasons and scrap captured on mobile, with utilisation shown daily.
3. AssemblyMissing parts stop the line, and work-in-progress is invisible.Work orders with part availability checked in advance and WIP visible by stage.
4. Quality checkRejections are found by the customer, and there are no records to find the cause.Inspection results per batch, with rejection reasons and trends.
5. Packing & dispatchLate dispatch, missing documents and slow collections.Dispatch planning, same-day invoices and automatic payment reminders.

We just walked your factory. Now let's fix the leaks.

A free visit or call. We'll show you which stage costs you the most, and how quickly it can be fixed.